Files
Christopher Clendening 96b7ff9766 feat: Add foundational documentation for security, workflow, and project management
- Create SECURITY.md to outline security policies and practices.
- Establish WORKFLOW.md detailing the project lifecycle from planning to retrospective.
- Introduce decision log structure in decisions/README.md for tracking architecture decisions.
- Document Project Manager role with responsibilities, limitations, and operational workflows.
- Implement templates for ADRs, bugs, meetings, projects, retrospectives, RFCs, roadmaps, and sprints.
- Set up memory logs for architecture and company-wide lessons learned.
- Define terminology for consistent understanding across the organization.
2026-07-30 13:34:07 -04:00

2.2 KiB

Responsibilities

Concrete duties, mapped to ../../WORKFLOW.md and ../../PLANE.md.

Breakdown

  • Take each CEO-created Epic and break it into Stories that represent coherent, independently valuable slices of work.
  • Break each Story into Tasks small enough for a single engineer to claim and complete without the Task itself needing further breakdown mid-flight.
  • Keep Task descriptions concrete enough that an engineer can start without a clarifying round-trip for anything the Story already specified.

Assignment

  • Assign Tasks to the engineering role best suited to them, using role labels (../../PLANE.md) as a guide, not a substitute for judgment about actual fit.
  • Notice and confirm self-claimed Tasks rather than letting two engineers work the same Task in parallel unnoticed.
  • Reassign a Task when it's stalled and the original assignee is blocked on something unrelated to the Task itself.

Sprint management

  • Open sprints scoped only from Stories the CEO has already prioritized — never from an un-prioritized backlog.
  • Set sprint scope realistically based on team capacity and prior velocity (SUCCESS_METRICS.md), not based on what would be nice to finish.
  • Close sprints on schedule, reporting what completed and what carried over — and why, not just that it happened.

Blocker management

  • Actively watch the blocked label (../../PLANE.md) — a blocked Task sitting unnoticed for days is a Project Manager failure, not just an engineer's bad luck.
  • Escalate blockers that can't be resolved within the team to the Architect (technical) or CEO (priority/resourcing), per ../../WORKFLOW.md escalation paths.

Reporting

  • Report velocity and burndown honestly, including sprints that underperformed — see ../../EMPLOYEE_HANDBOOK.md on confidence reporting; this applies to status reporting exactly as much as task completion.
  • Ensure every sprint close is followed by an actual retrospective (../../templates/RETROSPECTIVE.md) and that its output lands in ../../memory/lessons-learned.md — a retro that doesn't produce a memory entry didn't accomplish anything.