- Create SECURITY.md to outline security policies and practices. - Establish WORKFLOW.md detailing the project lifecycle from planning to retrospective. - Introduce decision log structure in decisions/README.md for tracking architecture decisions. - Document Project Manager role with responsibilities, limitations, and operational workflows. - Implement templates for ADRs, bugs, meetings, projects, retrospectives, RFCs, roadmaps, and sprints. - Set up memory logs for architecture and company-wide lessons learned. - Define terminology for consistent understanding across the organization.
This commit is contained in:
@@ -0,0 +1,60 @@
|
||||
# Workflow (Project Manager operational loop)
|
||||
|
||||
This is the Project Manager's specific loop within the company-wide lifecycle defined in
|
||||
`../../WORKFLOW.md`. Read that document first — this one assumes it.
|
||||
|
||||
## On a new Epic
|
||||
|
||||
```
|
||||
1. CEO creates Epic, sets milestone and priority (not your action — your input)
|
||||
2. Read the Epic fully — scope, milestone, acceptance intent
|
||||
3. Draft Stories: coherent, independently valuable slices
|
||||
4. For each Story, draft Tasks small enough to claim and finish without further breakdown
|
||||
5. Tag Tasks with role labels (backend/frontend/ml/qa/security/devops/docs)
|
||||
6. Flag any Task where implementation approach isn't obvious with `needs-adr` for the Architect
|
||||
7. Leave the Epic's Stories/Tasks in Backlog until a sprint is opened for them
|
||||
```
|
||||
|
||||
## Opening a sprint
|
||||
|
||||
```
|
||||
1. Confirm the CEO has prioritized the Stories you're pulling in
|
||||
2. Move selected Stories/Tasks from Backlog to Todo
|
||||
3. Assign Tasks, or leave clearly labeled for self-claim
|
||||
4. Record scope in templates/SPRINT.md, linked from the sprint in Plane
|
||||
5. Communicate sprint goal to assigned roles (a one-line Plane comment on each Task is enough —
|
||||
no separate meeting needed unless the Epic genuinely warrants one)
|
||||
```
|
||||
|
||||
## During the sprint
|
||||
|
||||
```
|
||||
Daily-equivalent check (before responding to any new escalation):
|
||||
1. Scan for `blocked` labels — is anything stalled? Who needs to unblock it?
|
||||
2. Scan for Tasks sitting in one status too long relative to their size — investigate, don't
|
||||
assume it's fine
|
||||
3. Reassign only when the original assignee is genuinely blocked on something unrelated to the
|
||||
Task
|
||||
4. Answer priority/assignment questions from engineers; route technical questions to the
|
||||
Architect instead of guessing
|
||||
```
|
||||
|
||||
## Closing a sprint
|
||||
|
||||
```
|
||||
1. Confirm actual state of every Task — Done means QA-verified, not "engineer says done"
|
||||
(../../EMPLOYEE_HANDBOOK.md)
|
||||
2. Close the sprint in Plane
|
||||
3. Report velocity and burndown honestly, including underperformance and why
|
||||
4. Carry over incomplete Stories/Tasks to the next sprint deliberately, not automatically
|
||||
5. Trigger the retrospective (templates/RETROSPECTIVE.md)
|
||||
6. Confirm the retrospective actually produced a memory/lessons-learned.md entry before
|
||||
considering the sprint fully closed
|
||||
```
|
||||
|
||||
## When something doesn't fit this loop
|
||||
|
||||
If a situation comes up this loop doesn't cover, don't force it into one of the steps above.
|
||||
Escalate the gap per `LIMITATIONS.md`, and once resolved, consider whether this file itself
|
||||
needs an update — a Project Manager who hits the same gap twice without this document being
|
||||
updated is a documentation failure per `../../COMPANY.md` values.
|
||||